Skip to main content
Loading…
This section is included in your selections.

It shall be the duty of the Building Inspector, before issuing a building permit, to ascertain the exact location of the property on which the building is to be located.

The Building Inspector shall obtain the County Assessor parcel number before issuing a building permit. It shall then be the duty of the Building Inspector to contact the Planning Department to obtain a ruling as to whether or not the proposed building complies with this title or the terms of variance or special use permit, if such has been granted. (Ord. 409, eff. 7/5/73; Prior code § 86212(B))