32.05.190 Construction materials and methods.
This section is included in your selections.
All new construction and substantial improvement shall be constructed:
A. With materials and utility equipment resistant to flood damage;
B. Using methods and practices that minimize flood damage;
C. With electrical, heating, ventilation, plumbing and air conditioning equipment and other service facilities that are designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding; and
D. Within Zones AH or AO, so that there are adequate drainage paths around structures on slopes to guide flood waters around and away from proposed structures. (Formerly 32.17.002)